Placing GPU Workloads: A Practical Guide to Latency, Memory, and Data Locality
Planning GPU workloads means deciding how timing, memory, capacity, and data boundaries affect placement. This guide reviews four illustrative placement patterns, walks through a labelled hypothetical example, and explains what to validate at representative load before adopting an arrangement.
The Placement Problem
GPU workloads are not homogeneous. An interactive inference request and a training run place very different demands on shared infrastructure. A planning risk worth checking is whether competing workload classes could affect each other's response time or access to capacity.
We recommend making placement an explicit design decision before choosing infrastructure.
Planning Inputs
Effective placement starts with recording what each workload actually needs. AIMPLE's workload placement reference identifies the key inputs: peak concurrency, acceptable response or completion time, model memory footprint, supported accelerators, and resource requirements under representative load.
Timing, memory, capacity, data-locality constraints, and access boundaries are all relevant planning inputs; the weight each carries depends on the specific workload class. AIMPLE's deployment guide notes that deployment planning should also cover data processing and access boundaries, available infrastructure, and proximity to devices or data.
Scheduling priorities should account for bursts, waiting time, and capacity shortages.
Four Placement Patterns
The following four patterns, drawn from AIMPLE's workload placement reference, illustrate how different workload classes might be assigned to infrastructure. These are starting points, not prescriptions; the right arrangement depends on the planning inputs above.
Reserved Capacity for Latency-Sensitive Inference
For latency-sensitive interactive inference, reserved GPU capacity is one placement option to evaluate. We recommend validating the amount to reserve and any sharing policy against the workload's targets. AIMPLE's deployment guide recommends defining response-time targets and reserved capacity explicitly as part of planning.
A Shared Pool for Generation Throughput
The reference presents a GPU pool for generation throughput as an illustrative placement option. We recommend evaluating any proposed sharing policy against the timing and capacity requirements of the workloads that would use it.
Queued Scheduling for Flexible-Start Jobs
The reference illustrates queueing for flexible-start training. We recommend using the acceptable-wait input to evaluate whether a queue is suitable for that workload. Scheduling priorities should account for bursts, waiting time, and capacity shortages.
Proximity Placement for Real-Time Data Sources
The reference illustrates nearby processing for real-time video. We recommend evaluating proximity alongside data locality and access-boundary requirements before choosing this pattern. AIMPLE's deployment guide recommends considering data processing and access boundaries, available infrastructure, and proximity to devices or data.
A Hypothetical Planning Example
The following is an illustrative scenario, not a measured deployment result.
Suppose an organisation operates three workload classes: interactive API inference, nightly document summarisation, and periodic fine-tuning. Under a single shared-pool arrangement, fine-tuning runs that extend longer than planned could delay inference requests beyond the team's response-time targets—a risk worth evaluating before go-live.
A structured placement approach might separate these: interactive inference on reserved slots sized to response-time targets, summarisation in a throughput pool scheduled during off-peak hours, fine-tuning in a queue with a generous acceptable-wait window. Memory planning for each class is intended to reduce the chance of capacity conflicts across model variants. This arrangement would still require testing against representative combined load before any conclusions could be drawn.
Validating the Plan
AIMPLE's deployment guide recommends running interactive and batch workloads together at representative peak load. As a practical test hypothesis, combined execution could reveal contention that isolated checks do not expose. The guide also recommends establishing clear ownership for monitoring and incident response before expanding the rollout, and that a pilot should use representative workloads on target infrastructure.
Teams should consider repeating validation when key planning inputs change. Scheduling priorities may also need revisiting when burst behaviour or capacity shortages reveal gaps between the original capacity model and observed demand.
Limitations
The objective of placement planning is to manage contention risk; whether a proposed arrangement helps must be tested. Consider checking whether available accelerators, capacity, and other deployment-specific constraints permit the proposed allocation. Requirements such as procurement timelines or regulatory data residency, if relevant, need independent verification rather than assumptions based on these planning examples.
For illustrative placement patterns, scheduling priority inputs, and planning considerations, see AIMPLE's workload placement reference.